Planner/Scheduler

  • Principal Technical Services
  • Laurel, Montana
PTS is currently for a Planner/Scheduler in Laurel, MT.
Contract position from August 2025 to August 2028. Per diem is offered. 5x10's schedule.
The successful candidate will be responsible for planning and scheduling both planned and unplanned events.
Responsibilities:

Routinely communicate planning status to the TA Manager.

Keep planning team aligned with steering team goals.

Lead the development of both the plan to plan and the detailed execution plan. Meet all planning milestones.

Maintain consistency in planning and estimating across all areas and contractors. Ensure job plans and estimates are maintained in the TA library for use in future TAs.

Oversee the development of the Primavera schedule and all work packages. Routinely audit work packages for quality, constructability, safety, congestion, schedule accuracy and materials.

Oversee the material coordination for the TA. Audit job kits for completion and proper storage location.

Flag / resolve resource constraints necessary to meet planning milestones.

Track milestones and report compliance, completion rates and target dates to the TA steering team.

Provide technical support and leadership for planners and schedulers.

Provide detailed work packages to contractors and contractor coordinators.

Document Work Scope Collection Process. Train key contributors on their roles with respect to scope identification and scope freeze (ie. what is expected of engineering, operations, etc. to gather scope).

Write planning basis document to outline assumptions, planning quality requirements, necessary elements of each plan, data transfer method to scheduling tool, etc.

Recommend resource requirements and needs to the TA manager.

Coordinate with the TA Manager to draft the contracting strategy.

Document planning requirements and oversee planning quality.

Work with operations and engineering to define cleanliness criteria and guidelines.

Assign pre-turnaround work execution supervision responsibility

Set expectations for interface with supporting technical disciplines (level of written communications on scope, meeting routine, etc.).

Define work package content, package quality expectations and planning status reporting metrics.

Define work package review & approval process.

Plan work packages.

Prepare contractor bid requests.

Review Bid Packages for Major Contracts

Participate in contractor mobilization plans,

Document equipment bills of materials (BOM's) and order materials.

Build work packages using pre-determined guidelines.

Test productivity assumptions

Submit preliminary work scope for contracts

Define Hydroblast Requirements

Define Tool Supply and Tool Room Procedures

Document field tagging guidelines

Complete critical path constructability reviews

Complete crane and rigging plans

Complete scope risk assessment

Complete all work package reviews

Review schedule with contractor

Distribute all work packages to field supervision

Complete information posting

Incorporate scope changes into work packs

Lead Scheduler Responsibilities (contracted position TA manager maintains consistency):

Maintain the scheduling basis document (productivity assumptions, key milestones, reporting needs, information process flow, planning input, etc.) to define the scheduling process. Include the key structural elements of the schedule (resource coding, WBS, work order numbering, assumptions, key milestones, logic ties, hold points)

Coordinate with the TA manager to determine the daily schedule reporting needs (critical path, near critical path, S curves, productivity, etc.

Establish requirements for look-ahead processing.

Lead critical path analysis and optimization reviews.

Establish schedule development milestones (baseline issue, optimization, critical path analysis, level, final schedule, etc.).

Define schedule software interfaces and establish expectations for planning group.

Train field personnel on schedule related administration.

Coordinate with the operations representative to establish system handover schedule and operations manpower needs.

Level ancillary craft needs.

Tie hold points to QA/QC, PSSR and MOC steps.

Define field schedule progress reporting strategy

Coordinate with core team to define schedule priorities.

Perform schedule risk profiling

Load field responsibility names

Complete schedule development

Perform Density Reviews

Load Execution Milestones

Perform Resource Leveling

Schedule pre TA work.

Issue final baseline schedule

Document implementation of recovery plans in schedule

Provide work schedules and work packs for shift

Hourly wage: $70-$80 based on experience.

Apply now for immediate and confidential consideration!

#IND1

Job ID: 482561497
Originally Posted on: 6/24/2025

Want to find more Construction opportunities?

Check out the 176,272 verified Construction jobs on iHireConstruction